Skip to content
SAM100 by Construction Robotics

Product highlights

  • Robotic arm applies mortar and lays bricks with laser guidance
  • Programmed brick patterns support long, uninterrupted wall sections
  • Human crews handle setup, material loading, finishing, corners and openings
  • Clark’s Winter 2015 project newsletter documents SAM100 placing approximately 12,000 bricks at the Lab School of Washington alongside Construction Robotics and masonry crews. This is a dated contractor deployment report, not an independent universal productivity test or a claim of current availability.
  • The Clark report describes a conveyor pick station, measurement of brick height/width with out-of-spec bricks rejected, mortar application and laser-referenced placement. The capability is documented for that installation and is not proof of autonomous navigation around an unprepared jobsite.
  • The August 22, 2018 University of Nevada report quotes 200-250 bricks per hour and separately observes about eight seconds per brick. Cycle arithmetic does not establish sustained 450-per-hour or full-shift output; these are historical project claims, not current universal ratings.
  • Crews remain responsible for scaffold/system setup, programming, material loading, row alignment and joint finishing. The 2018 account assigns the first five feet, corners and window/door interruptions to manual masons; workforce-equivalence and schedule-saving quotes are not general labor-replacement guarantees.

Product sources

Description

Historical Semi-Automated Mason robot documented by Clark on its Lab School of Washington project in Winter 2015 and by the University of Nevada, Reno on its Arts Building in August 2018. A material feeder supplies bricks to a robotic arm for mortar application and laser-referenced placement. Crews set up, program, load and finish work and handle interruptions, corners and openings. Project-specific throughput is distinct from travel speed and guaranteed shift output. Current MULE lift-assist ratings are not SAM100 specifications; present sales/support remain unverified.

commercialconstructionbricklayingindustrial

Specifications

Sources cover the marked fields only. Unmarked values have not been checked in this review; manufacturer figures are not independent test results.

PriceSource review · Not disclosed
ThroughputSource review · 200-250 bricks/h quoted in the August 2018 University of Nevada project report; not a guaranteed whole-shift or current-model rating
Drive modeSource review · Programmed robotic brick placement with laser reference on prepared scaffolding; human setup, loading, alignment and finishing
TerrainSource review · Prepared scaffold-based masonry workflow on long, uninterrupted wall sections; crews set up and align the installation
Back to catalog